d4c9704007
Primary verification pass over the delegated push-loop delivery: - Remove the unused LongSupplier clock threaded into ReplyPushLoop (timing is the scheduler's; the field was never read) from the component, Bridged wiring, and both test call sites. - Collapse the single-statement WAIT_BUSY switch arm (redundant block). - Drop now-dead test scaffolding: the always-"idle" recordingClient param and unused AgentStatus/AtomicReference imports. IDE diagnostics 0/0 on all changed files; mvn clean install green (242 tests, 0 failures).