8d4206c2b5
Carries PR #84 (its head `78ca24d` is an ancestor of this one), so this single merge delivers both rounds. CB-590 collapses the CB-307 reply schedule and the CB-588 ticket schedule into one per lead, which closes the double-injection race. The review round found that this also collapsed the two reminder caps into one shared budget — so a busy reply stream could exhaust the cap and a ticket arriving afterwards would never be nudged at all. That was a regression, not a pre-existing wart: before this PR the two sources had independent counters. The follow-up keeps the single schedule and gives each source its own budget. `decide()` returns INJECT while either source has pending work under its own cap, and STOP only when neither does. `stopOrRestart` and its snapshot-diff race logic are untouched. Verified by the lead: `mvn -f bridged/pom.xml clean install` unpiped, exit code captured — Tests run: 814, Failures: 0, Errors: 0, Skipped: 0 — BUILD SUCCESS. `ReplyPushLoopTest`: 41 tests. Known and deliberately out of scope: an item arriving during the 15s backoff is already inside the tick's "before" snapshot, so at-cap work can be abandoned rather than nudged once. That shape predates this PR in the ticket-only loop and is filed as #87 (CB-598).